Skip to search boxSkip to navigationSkip to main content

Scheduling of pipeless batch plants using constraint satisfaction techniques

Research Output:
Contribution to journal
Article
Peer-review

Abstract

Process industries need to be able to adapt to the fast changing market in order to meet consumer demands. Pipeless batch plants are being developed and implemented to improve flexibility to meet this requirement. However, their efficiency greatly depends on the generation of feasible production schedules. This paper proposes a general constraint model to solve this kind of scheduling problem for pipeless batch plants. In this model, constraints on resource allocation, activity precedence, time bound and safety issues are considered. A computer system, BPS, based on the constraint model and the search algorithm used in BPS are also presented. A case study is described to demonstrate the applicability of the proposed approach.

Publication Information

Output type

Research Output:
Contribution to journal
Article
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 377-383

Journal (Volume, Issue Number)

Computers and Chemical Engineering (Volume 24, Issue 2-7)

Publication milestones

  • Published - 01/01/2000

Publication status

Published - 01/01/2000

ISSN

0098-1354

Publication IDs

  • handle.net: 10547/276012
  • Scopus: 0034660721

Publication metrics