Skip to search boxSkip to navigationSkip to main content

A constraint approach for rescheduling batch processing plants including pipeless plants

Research Output: Contribution to journal Article Peer-review

Abstract

In the process industries batch plants are attracting attentions because of their suitability for producing small-volume, high-value added commodity chemicals. Pipeless plants have also been developed and built to increase plant flexibility. Unexpected events, such as the failure of a processing unit, sometimes happen during operations. To avoid risk and to utilise the remaining resource, it is important to reschedule the production operation quickly. The constraint model in BPS has been extended to include constraints for rescheduling. These additional constraints are described in this paper and a case study is used to demonstrate the feasibility of the approach.

Publication Information

Output type

Research Output: Contribution to journal Article Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 161-166

Journal (Volume, Issue Number)

Computer Aided Chemical Engineering (Volume 14)

Publication milestones

  • Published - 01/01/2003

Publication status

Published - 01/01/2003

ISSN

1570-7946

External Publication IDs

  • handle.net: 10547/276013
  • Scopus: 77956768604

Publication metrics