Skip to main navigation Skip to search Skip to main content

Scheduling of pipeless batch plants using constraint satisfaction techniques

Research output: Contribution to journalArticlepeer-review

16 Citations (Scopus)

Abstract

Process industries need to be able to adapt to the fast changing market in order to meet consumer demands. Pipeless batch plants are being developed and implemented to improve flexibility to meet this requirement. However, their efficiency greatly depends on the generation of feasible production schedules. This paper proposes a general constraint model to solve this kind of scheduling problem for pipeless batch plants. In this model, constraints on resource allocation, activity precedence, time bound and safety issues are considered. A computer system, BPS, based on the constraint model and the search algorithm used in BPS are also presented. A case study is described to demonstrate the applicability of the proposed approach.
Original languageEnglish
Pages (from-to)377-383
JournalComputers and Chemical Engineering
Volume24
Issue number2-7
DOIs
Publication statusPublished - 1 Jan 2000

Keywords

  • constraint satisfaction problems

Fingerprint

Dive into the research topics of 'Scheduling of pipeless batch plants using constraint satisfaction techniques'. Together they form a unique fingerprint.

Cite this